INSTALLATION of JY500B3 EMBEDDED TYPE BELT SCALE CONTROLLER
Overview:
Please don’t install this equipment in the places where environment and condition change acutely. Choose a house to install to the best of your abilities, or other place where fix safeguard to avoid sunshine, dampness, impact and exquisite machine shake.
This equipment may be installed less than 2000 meters away from the load cell.
Install JY500B3 embedded type controller vertically on the firm, flat wall via the 4 holes behind the machine shell.
Safety Warming:
Don't carry on any operation such as installation, running and maintenance before finishing reading following caution regulation
1. Don't connect to power supply before comprehending the manual completely.
2. Obey the warning and the operation procedures within this manual strictly, to avoid personnel's injury and equipments damage.
Connection:
1.Make sure the power supply is cut off.
2.Don’t lay the signal wires and power wires or other cables with high electromagnetic interference in the same canal.
3.Equipment shell and canals must be connected to the earth.
4.Check if all the wires right and firm.
5.Forbid checking the circuit with megohm meter.
6.Install breaker (20A at most) ahead the power supply port, where must be convenient to operate, and the breaker must be remarket for the equipment obviously.
7.All canals must be encase from the bottom instead of the top or the flank of the machine shell.
Shen Zhen Zhuohe Instrumentation Co.,Ltd was founded in year of 2002.We specialize in providing BATCHING CONTROLLER,BELT SCALE CONTROLLER,PACKAGING CONTROLLER and WEIGHING TRANSMITTER.
If you are interested in our products, welcome to contact us via email.